Product Overview
Technical Summary
| Product model | 6AV7241-5GC55-0FA0 |
|---|---|
| Display | 19" TFT multi-touch; 1 920 pixel × 1 080 pixel |
| Processor | Core i5-6442EQ |
| Memory | 16 GB |
| Interfaces | 4 USB (back); Ethernet (10/100/1000); 3x Gbit Ethernet (IE/PN) |
| Storage | 240 GB solid-state drive SATA |
| Operating system | Windows 10 Enterprise 2019 LTSC (64-bit), MUI (en,de,fr,it,es) |
| Power supply | 24 V DC industrial power supply |
| Exclusions | Without RS 232/RS485, without PCIe, without SIMATIC software, without replaceable mass storage |
| Mounting | Central design; portrait format possible; mounting cutout 448 mm × 278 mm; mounting depth 76 mm |
| Protection | ATEX/IECEx |
| Lifecycle | Announcement of product phase-out |
Key Features
19" TFT multi-touch display with 1 920 pixel horizontal resolution and 1 080 pixel vertical resolution; projective-capacitive touch operation.
Core i5-6442EQ processor with 16 GB memory.
4 USB ports at the back and Ethernet (10/100/1000); 3x Gbit Ethernet (IE/PN).
240 GB SATA solid-state drive; Windows 10 Enterprise 2019 LTSC (64-bit), MUI (en,de,fr,it,es), without SIMATIC software and without replaceable mass storage.
24 V DC industrial power supply; without RS 232/RS485 and without PCIe.
Central design mounting, portrait-format mounting possible, and ATEX/IECEx; mounting cutout: 448 mm × 278 mm, mounting depth 76 mm.
Frequently Asked Questions
Which exact line item is this?
It is Siemens 6AV7241-5GC55-0FA0, SIMATIC IPC 477E with a 19" multi-touch display.
What display and computing configuration does it have?
It has a 19" TFT multi-touch display with 1 920 pixel × 1 080 pixel resolution, a Core i5-6442EQ processor, 16 GB memory and a 240 GB SATA solid-state drive.
Which interfaces and exclusions should be retained in the BOM?
It has 4 USB ports at the back, Ethernet (10/100/1000) and 3x Gbit Ethernet (IE/PN). It is without RS 232/RS485, without PCIe, without SIMATIC software and without replaceable mass storage.
What quantity, destination, schedule and additional BOM lines should be included in the quotation request?
Please provide the requested quantity, destination, schedule context and any additional BOM lines with your project list.
