Product Overview
Technical Summary
| Product type | IPC477E |
|---|---|
| Display | 19" TFT touch |
| Display resolution | 1 366 pixel × 768 pixel |
| Processor | Core i3-6102E (2C/4T, 1.9 GHz, 3 MB Cache) |
| Main memory | 4 GB |
| Storage | 256 GB Eco SSD |
| Industrial Ethernet | 3x Gbit Ethernet (IE/PN), RJ45 |
| Serial interface | Without RS 232/RS485 |
| Supply | 24 V DC industrial power supply |
| Mounting | Panel PC, built-in unit; horizontal and vertical mounting |
| Operating system | Windows 10 Enterprise 2019 LTSC (64-bit), MUI (en,de,fr,it,es) |
| Product lifecycle | Announcement of product phase-out |
Key Features
19" TFT touch display with 1 366 pixel horizontal resolution and 768 pixel vertical resolution; analog, resistive touch operation.
Core i3-6102E processor with 2C/4T, 1.9 GHz and 3 MB Cache; 4 GB memory and 256 GB Eco SSD.
3x Gbit Ethernet (IE/PN) with 3 industrial Ethernet interfaces using RJ45 connectors.
Panel PC built-in unit for horizontal and vertical mounting; mounting in portrait format is possible.
24 V DC industrial power supply; rated value 24 V, PELV / SELV floating.
Windows 10 Enterprise 2019 LTSC (64-bit), MUI (en,de,fr,it,es); without SIMATIC software and without replaceable mass storage.
Frequently Asked Questions
What display does Siemens 6AV7241-3DA15-0DA0 have?
It has a 19" TFT touch display with 1 366 pixel horizontal resolution, 768 pixel vertical resolution and analog, resistive touch operation.
Which processor, memory and storage are included in this configuration?
The configuration has a Core i3-6102E processor, 4 GB memory and a 256 GB Eco SSD.
Which interfaces are included?
It has 3x Gbit Ethernet (IE/PN) through 3 RJ45 industrial Ethernet interfaces, 2x DisplayPort and 1x PCIe (x4). It is without RS 232/RS485.
Which supply and mounting options apply?
The line item has a 24 V DC industrial power supply and is a built-in Panel PC for horizontal and vertical mounting. Portrait mounting is possible.
What should be provided for a quotation request?
Provide the requested quantity, destination, schedule context and any additional BOM lines for the project quotation.
