Product Overview
Technical Summary
| Product type | IPC427E |
|---|---|
| Processor | Core i5-6442EQ (4C/4T, 1.9 (2.7) GHz, 6 MB Cache, iAMT) |
| Main memory | 8 GB DDR4-2400 SO-DIMM |
| Storage | 320 GB HDD SATA |
| Industrial Ethernet | 3 interfaces; Ethernet (2x RJ45, optional 3x RJ45) |
| Video interface | 2x DisplayPort |
| Serial interface | Without / 2x COM (RS 232 / 485 / 422; switchable) |
| Supply voltage | 24 V DC; 24 V; PELV / SELV floating |
| Mounting | DIN rail, wall mounting, portrait mounting |
| Design | Box PC, built-in unit |
| Protection | IP20 |
| Lifecycle | Announcement of product phase-out |
Key Features
Core i5-6442EQ processor with 4C/4T, 1.9 (2.7) GHz, 6 MB Cache and iAMT; configured with 8 GB DDR4-2400 SO-DIMM.
320 GB HDD SATA; without replaceable mass storage and without operating system.
3 industrial Ethernet interfaces with 100 Mbps and 1000 Mbps support; Ethernet configuration with 2x RJ45.
1x PCIe (x4), 2x DisplayPort and PCIE optional; without RS232/485.
Box PC, built-in unit for DIN rail, wall or portrait mounting; 24 V DC industrial power supply.
LED status display with 1x power and 3x user indicators, bus diagnostics, temperature monitoring and IP20 protection.
Frequently Asked Questions
What exact processor and memory configuration does 6AG4141-5BB10-0JA0 use?
It uses a Core i5-6442EQ processor with 4C/4T, 1.9 (2.7) GHz, 6 MB Cache and iAMT, plus 8 GB DDR4-2400 SO-DIMM.
Which interfaces are included in this configuration?
It has 3 industrial Ethernet interfaces, Ethernet with 2x RJ45, 2x DisplayPort and 1x PCIe (x4). It is without RS232/485.
How is the Box PC mounted and supplied?
It supports DIN rail, wall and portrait mounting, and has a 24 V DC industrial power supply.
Which software and storage exclusions apply to this line item?
It is without operating system, without SIMATIC software and without replaceable mass storage; the configuration includes a 320 GB HDD SATA.
What information should I include when requesting this item?
Include the requested quantity, destination, schedule context and any additional BOM lines for the quotation request.
