Product Overview
Technical Summary
| Product type designation | IPC477E |
|---|---|
| Display | 22" TFT touch |
| Resolution | 1 920 × 1 080 pixel |
| Processor | Core i5-6442EQ (4C/4T, 1.9 (2.7) GHz, 6 MB Cache, iAMT) |
| Main memory | 16 GB |
| Supply | 24 V DC industrial power supply |
| Industrial Ethernet | 3; 3x Ethernet (RJ45) |
| Serial interface | 2x COM (RS 232 / 422 / 485), selectable in the BIOS |
| Mounting | Panel PC, built-in unit; horizontal and vertical mounting; portrait format possible |
| Protection | IP65 at the front; IP20 at the rear |
| Excluded configuration | Without PCIe, operating system, replaceable mass storage, internal mass storage and SIMATIC software |
Key Features
22" TFT touch display with analog, resistive touch operation and 1 920 × 1 080 pixel resolution.
Core i5-6442EQ processor with 4C/4T, 1.9 (2.7) GHz, 6 MB Cache and iAMT; 16 GB main memory.
3 industrial Ethernet interfaces with 3x Ethernet (RJ45); 100 Mbps and 1000 Mbps supported.
2x COM with RS 232 / 422 / 485, selectable in the BIOS.
Panel PC built-in unit for horizontal and vertical mounting, with portrait mounting possible; IP65 at the front and IP20 at the rear.
Without PCIe, without operating system, without replaceable mass storage, without internal mass storage and without SIMATIC software.
Frequently Asked Questions
What display and resolution does the 6AV7241-5EC30-0AA0 have?
It has a 22" TFT touch display with analog, resistive touch operation and 1 920 × 1 080 pixel resolution.
Which interfaces are included in this configuration?
The configuration has 3 industrial Ethernet interfaces with 3x Ethernet (RJ45), 2x COM with RS 232 / 422 / 485 selectable in the BIOS, and 2x DisplayPort.
What is the power supply for this line item?
The line item has a 24 V DC industrial power supply; the rated DC value is 24 V, PELV / SELV floating.
Which items are excluded from this configuration?
It is without PCIe, without an operating system, without replaceable mass storage, without internal mass storage and without SIMATIC software.
What should be provided for a project quotation request?
Provide the requested quantity, destination, schedule context and any additional BOM lines for quotation review.
