Product Overview
Applications
Time stamping is suitable for isochronous mode.
The supplied description includes expanded quantity structure for HART auxiliary variables.
Technical Summary
| Product type | IM 153-2 DP HF |
|---|---|
| Module capacity | Up to 12 S7-300 modules per DP device interface |
| PROFIBUS DP transmission | RS 485, up to 12 Mbit/s |
| Supply voltage | 24 V DC; permissible range 20.4 V to 28.8 V |
| Time-stamping accuracy | 1 ms at up to 8 modules; 10 ms at up to 12 modules |
| Stampable digital inputs | Up to 128; max. 32 signals/slot |
| Connection | 9-pin sub D socket |
| Configuration software | STEP 7 / COM PROFIBUS / non-Siemens tools via GSD file |
| Protection | IP20 |
| Installation temperature | 0 °C to 60 °C horizontal; 0 °C to 40 °C vertical |
| Product lifecycle | Product cancellation |
Key Features
Supports up to 12 S7-300 modules per DP device interface and has redundancy capability.
Uses RS 485 with transmission rates up to 12 Mbit/s and a 9-pin sub D socket connection.
Rated supply voltage is 24 V DC, with a permissible range from 20.4 V to 28.8 V.
Time-stamping accuracy is 1 ms at up to 8 modules and 10 ms at up to 12 modules; up to 128 digital inputs are stampable.
Supports STEP 7, COM PROFIBUS, and non-Siemens tools via the GSD file SI05801E.GSG.
The item is identified as a spare part and has product cancellation status.
Frequently Asked Questions
What is the exact product type of Siemens 6ES7153-2BA10-0XB0?
The product type designation is IM 153-2 DP HF, an ET 200M connection for up to 12 S7-300 modules.
What supply voltage does this connection use?
The rated supply voltage is 24 V DC. The permissible range is 20.4 V to 28.8 V.
Which interface and connection does it provide?
It provides PROFIBUS DP communication over RS 485, with a 9-pin sub D socket and transmission rates up to 12 Mbit/s.
What configuration software is supported?
It supports STEP 7, COM PROFIBUS, and non-Siemens tools via the GSD file SI05801E.GSG.
What should be included with a project quotation request?
Include the requested quantity, destination, schedule context, and any additional BOM lines for quotation review.
