Product Overview
Applications
Supports PROFINET IO Controller and IO Device functionality, including simultaneous operation.
Supports PROFIBUS DP master and device functions with transmission rates up to 12 Mbit/s.
Technical Summary
| Product type | CPU 317-2 PN/DP |
|---|---|
| Work memory | 1 024 kbyte, integrated; not expandable |
| Supply voltage | 24 V DC rated; permissible range 20.4 V to 28.8 V DC |
| MPI/PROFIBUS DP interface | 1 integrated RS 485 interface; up to 12 Mbit/s |
| PROFINET interface | 1 interface; 2-port RJ45 switch; up to 100 Mbit/s |
| PROFINET IO devices | 128 connectable IO Devices maximum |
| Digital channels | 65 536 inputs and 65 536 outputs |
| Analog channels | 4 096 inputs and 4 096 outputs |
| Firmware version | V3.2 |
| Lifecycle | Product cancellation |
Key Features
Integrated work memory: 1 024 kbyte; not expandable.
1 MPI/PROFIBUS DP interface at up to 12 Mbit/s and 1 PROFINET interface with 2-port RJ45 switch.
PROFINET IO Controller and IO Device functionality are supported simultaneously; maximum transmission rate: 100 Mbit/s.
Rated supply voltage: 24 V DC; permissible range: 20.4 V to 28.8 V DC.
STEP 7 V5.5 or higher is supported. User program/password protection and block encryption with S7 block Privacy are supported.
A Micro Memory Card is required. Plug-in load memory is supported up to 8 Mbyte.
Frequently Asked Questions
What is the exact product type of 6ES7317-2EK14-0AB0?
It is a SIMATIC S7-300 CPU 317-2 PN/DP central processing unit.
What memory configuration does this CPU have?
It has 1 024 kbyte of integrated work memory, which is not expandable, and supports plug-in load memory up to 8 Mbyte.
Which communication interfaces are available?
It has 1 MPI/PROFIBUS DP interface at up to 12 Mbit/s and 1 PROFINET interface with 2 RJ45 ports and an integrated switch.
What is required for the memory configuration?
A Micro Memory Card is required.
Can this exact line item be included in a quotation request?
Yes. Include the exact order number, requested quantity, destination, schedule context, and any additional BOM lines.
