Product Overview
Applications
Central processing for PLC tasks.
Processing technology tasks.
Processing safety tasks.
Technical Summary
| Product type | CPU 317TF-3 PN/DP |
|---|---|
| Work memory | 1 536 kbyte, integrated; not expandable |
| Supply voltage | 24 V DC rated; permissible range 19.2 V to 28.8 V |
| Interfaces | MPI/DP 12 Mbps; DP (drive); Ethernet PROFINET with integrated 2-port switch |
| Digital inputs | 4, all usable for technology functions |
| Digital outputs | 8 high-speed outputs for technology functions |
| PROFINET IO | IO Controller and IO Device functionality supported simultaneously |
| Programming package | STEP 7 V5.5 SP2 or higher; S7-Technology option package V4.2 SP3 or higher; Distributed Safety V5.4 SP5 or higher |
| Ambient temperature during operation | 0 °C to 60 °C |
| Product lifecycle | Product cancellation |
Key Features
CPU 317TF-3 PN/DP central processing unit for PLC, technology and safety tasks.
Integrated work memory: 1 536 kbyte; not expandable.
MPI/DP interface at 12 Mbps, DP (drive) interface, and Ethernet PROFINET interface with integrated 2-port switch.
4 digital inputs and 8 digital outputs for technology functions.
Micro Memory Card required; plug-in load memory up to 8 Mbyte.
Rated supply voltage: 24 V DC; permissible range: 19.2 V to 28.8 V.
Frequently Asked Questions
What exact CPU variant is 6ES7317-7UL10-0AB0?
It is a CPU 317TF-3 PN/DP central processing unit for PLC, technology and safety tasks.
What memory does this CPU have?
It has 1 536 kbyte integrated work memory, which is not expandable. A Micro Memory Card is required, with plug-in load memory up to 8 Mbyte.
Which interfaces are provided?
It has an MPI/DP interface at 12 Mbps, a DP (drive) interface, and an Ethernet PROFINET interface with an integrated 2-port switch.
What supply voltage does it use?
The rated supply voltage is 24 V DC, with a permissible range from 19.2 V to 28.8 V.
What should be included in a quotation request for this line item?
Include the exact order number, requested quantity, destination, schedule context, and any additional BOM lines.
