Product Overview
Technical Summary
| Product type | IPC547J |
|---|---|
| Design | Rack PC, 19", 4 U |
| Processor | Xeon W-1270E (8C/16T, 3.4 (4.8) GHz, 16 MB cache) |
| Main memory | 64 GB DDR4 SDRAM (2x 32 GB), dual channel |
| Storage | 480 GB SSD 2.5 SATA |
| PCI slots | 5x PCI Express; 2x PCI |
| Ethernet | 3x Gbit Ethernet |
| Video interfaces | 1x DVI-D; 2x DisplayPort |
| USB interfaces | 6x USB 3.1 Gen.2; 2x USB 2.0 internal |
| Supply voltage | 100/240 V AC |
| Operating system | Windows Server 2019 Standard Edition including 5 clients, 64-bit, MMUI (en/de/fr/it/es) |
| Protection | IP30 at the front; IP20 at the rear |
Key Features
SIMATIC IPC547J, 19", 4 U, prepared for horizontal or vertical installation and telescopic rails; the 19" mounting bracket can be removed externally.
Intel Xeon W-1270E with 8C/16T, 3.4 (4.8) GHz, and 16 MB cache; 64 GB DDR4 SDRAM in 2x 32 GB, dual channel.
480 GB SSD, 2.5 SATA.
5x PCI Express and 2x PCI slots; 3x Gbit Ethernet, 1x DVI-D, 2x DisplayPort, 6x USB 3.1 Gen.2, 2x internal USB 2.0, COM1, and audio.
100/240 V AC industrial power supply unit with China power supply cable.
Windows Server 2019 Standard Edition including 5 clients, 64-bit, MMUI (en/de/fr/it/es); supplied without expansions. NVIDIA Quadro P2200 graphics card has 4x DP without adapter.
Frequently Asked Questions
What exact line item is this?
It is Siemens 6AG4104-5LD43-4KN0, a SIMATIC IPC547J rack PC, 19", 4 U.
Which processor, memory, and storage are configured?
The configuration has an Intel Xeon W-1270E (8C/16T, 3.4 (4.8) GHz, 16 MB cache), 64 GB DDR4 SDRAM (2x 32 GB), and a 480 GB 2.5 SATA SSD.
Which interfaces and slots are included?
It has 5x PCI Express, 2x PCI, 3x Gbit Ethernet, 1x DVI-D, 2x DisplayPort, 6x USB 3.1 Gen.2, 2x internal USB 2.0, COM1, and audio.
How is the PC mounted and powered?
It supports horizontal and vertical installation, is prepared for telescopic rails, and has a 100/240 V AC industrial power supply unit.
What should be included in a quotation request?
Provide the requested quantity, destination, schedule context, and any additional BOM lines for project quotation handling.
