Product Overview
Technical Summary
| Product type | IPC547J |
|---|---|
| Processor | Core i9-10900E (10C/20T, 2.8 (4.7) GHz, 20 MB cache) |
| Main memory | 8 GB DDR4 SDRAM (2x 4 GB), dual channel |
| Storage | RAID1, 2x 480 GB 2.5" SATA SSD |
| Interfaces | 3x Gbit Ethernet, 1x DVI-D, 2x DisplayPort, 6x USB 3.1 Gen.2, 2x USB 2.0 internal, AMT |
| Supply voltage | 100/240 V AC industrial power supply unit |
| Mounting | Horizontal and vertical installation; prepared for telescopic rails |
| Protection | IP30 at the front; IP20 at the rear |
| Lifecycle | Announcement of product phase-out |
| Exclusions | Without expansion; without operating system |
Key Features
Core i9-10900E with 10C/20T, 2.8 (4.7) GHz, 20 MB cache; 8 GB DDR4 SDRAM in 2x 4 GB, dual channel.
RAID1 with 2x 480 GB 2.5-inch SATA SSDs.
Mainboard with 3x Gbit Ethernet, 1x DVI-D, 2x DisplayPort, 6x USB 3.1 Gen.2, 2x internal USB 2.0, and AMT; front interfaces include 2x USB 3.0, with COM1 and audio on the rear side.
Rack PC, 19", 4U; suitable for horizontal and vertical installation and prepared for telescopic rails. The 19-inch mounting bracket can be removed externally.
Temperature and fan monitoring, watchdog, and SIMATIC IPC DiagMonitor enclosed. The configuration is without expansion and without operating system.
Frequently Asked Questions
What exact product is this line item?
It is Siemens 6AG4104-5KH13-1AX1, SIMATIC IPC547J, a 19-inch, 4U rack PC.
What processor, memory, and storage configuration does it have?
It has a Core i9-10900E processor, 8 GB DDR4 SDRAM (2x 4 GB), and RAID1 with 2x 480 GB 2.5-inch SATA SSDs.
Which interfaces are included?
It has 3x Gbit Ethernet, 1x DVI-D, 2x DisplayPort, 6x USB 3.1 Gen.2, 2x internal USB 2.0, AMT, COM1, and rear audio.
What mounting and protection details should be retained in the BOM?
It supports horizontal and vertical installation, is prepared for telescopic rails, and has IP30 protection at the front and IP20 at the rear.
What configuration exclusions apply when requesting this line item?
It is without expansion and without an operating system. Include the requested quantity, destination, schedule, and any additional BOM lines in the inquiry.
