Product Overview
Technical Summary
| Product type | IPC547J |
|---|---|
| Design | Rack PC, 19", 4U |
| Processor | Core i5-10500E (6C/12T, 3.1 (4.2) GHz, 12 MB cache) |
| Main memory | 16 GB DDR4 SDRAM (2x 8 GB), dual channel |
| Storage | 480 GB SSD 2.5 SATA |
| Interfaces | 2x USB 3.0 front; COM1 and audio rear |
| Slots | 5x PCI Express, 2x PCI |
| Supply voltage | 100/240 V AC industrial power supply unit |
| Mounting | Horizontal and vertical installation; prepared for telescopic rails |
| Protection | IP30 at the front; IP20 at the rear |
| Lifecycle | Announcement of product phase-out |
Key Features
Core i5-10500E with 6C/12T, 3.1 (4.2) GHz and 12 MB cache; 16 GB DDR4 SDRAM in a 2x 8 GB dual-channel configuration.
480 GB SSD 2.5 SATA in the supplied configuration; the line item is without expansions.
19", 4U rack PC with a short enclosure and drive support type C for internal installation.
2x USB 3.0 on the front, COM1 and audio on the rear side, plus 7 slots: 5x PCI Express and 2x PCI.
100/240 V AC industrial power supply unit with China power supply cable; prepared for horizontal and vertical installation and telescopic rails.
Temperature and fan monitoring, watchdog, POWER/HDD/Ethernet/WATCHDOG/TEMP/FAN LED status displays, IP30 at the front and IP20 at the rear.
Frequently Asked Questions
What exact configuration does Siemens 6AG4104-5DD03-2AX0 identify?
It identifies a SIMATIC IPC547J rack PC with a Core i5-10500E, 16 GB DDR4 SDRAM, 480 GB 2.5 SATA SSD, 100/240 V AC industrial power supply unit and China power supply cable.
Which interfaces and slots are included?
It has 2x USB 3.0 on the front, COM1 and audio on the rear side, 5x PCI Express slots and 2x PCI slots.
How can this rack PC be mounted?
It supports horizontal and vertical installation and is prepared for telescopic rails. The 19" mounting bracket can be removed externally; the tower kit is optional.
Does this configuration include an operating system or expansions?
It is without an operating system and without expansions.
What should I provide for a project quotation?
Provide the requested quantity, destination, schedule context and any additional BOM lines for quotation review.
