Product Overview
Technical Summary
| Product type | IPC847E |
|---|---|
| Design | Rack PC, 19", 4U |
| Installation | For horizontal and vertical installation; prepared for telescopic rails |
| Supply voltage | 100/240 V AC (autorange) 50 / 60 Hz |
| Processor | Intel Xeon E-2176G (6C/12T, 3.7 (4.7) GHz, 12 MB Cache, Turbo Boost 2.0, VT-x/-d-Technology, iAMT) |
| Main memory | 32 GB DDR4 SDRAM (2x 16 GB), ECC, Dual Channel (only with Xeon) |
| Interfaces | 1x COM1, 2x DisplayPort, 1x DVI-D, audio, 9x USB, 3x Gigabit Ethernet |
| Storage | RAID1, 2x 480 GB SSD 2.5" SATA |
| Graphics | PCIe x16 graphics card, 3x mDP; 3x adapter mDP to DP |
| Operating system | Windows 10 IoT Enterprise 2019 LTSC MUI, 64-bit (for Core i7/Xeon) |
| Protection | IP41 at the front; IP20 at the rear |
Key Features
SIMATIC IPC847E Rack PC, 19", 4U, for horizontal and vertical installation; prepared for telescopic rails.
Intel Xeon E-2176G with 6C/12T, 3.7 (4.7) GHz, 12 MB Cache, and 32 GB DDR4 SDRAM in 2x 16 GB, ECC, Dual Channel.
RAID1 with 2x 480 GB 2.5" SATA SSDs; 512 GB SSD M.2 NVMe to PCIe x4 adapter card, with 1 slot occupied.
3x Gigabit Ethernet, 1x DVI-D, 2x display ports, 1x COM 1, audio, 4x USB 3.1, 2x USB 3.1 Type C on the rear side, 2x USB 3.0 on the front, and 1x USB 3.1 internal.
100/240 V AC industrial power supply unit, temperature and fan monitoring, and Watchdog.
Windows 10 IoT Enterprise 2019 LTSC MUI, 64-bit, with a PCIe x16 graphics card, 3x mDP, and 3x adapter mDP to DP; without expansions.
Frequently Asked Questions
What exact product is this line item?
It is the Siemens 6AG4114-3MT07-5DX3, a SIMATIC IPC847E Rack PC.
What supply voltage does this configuration use?
Supply: 100/240 V AC industrial power supply unit.
Which interfaces are included?
It has 3x Gigabit Ethernet, 1x DVI-D, 2x display ports, 1x COM 1, audio, 4x USB 3.1, 2x USB 3.1 Type C on the rear side, 2x USB 3.0 on the front, and 1x USB 3.1 internal.
Does this configuration include expansions?
It is without expansions.
Can this line item be included in a project quotation?
Yes. Submit the requested quantity, destination, schedule context, and any additional BOM lines for quotation review.
