Product Overview
Applications
The rack PC supports temperature monitoring and fan monitoring.
Technical Summary
| Product type | SIMATIC IPC547J rack PC, 19", 4 U |
|---|---|
| Processor | Intel Core i3-10100E, 4C/8T, 3.2 (3.8) GHz, 6 MB cache |
| Main memory | 4 GB DDR4 SDRAM, 1x 4 GB, single channel |
| Storage | 1 TB HDD, 3.5" SATA |
| Ethernet | 2x Gbit Ethernet |
| Slots | 5x PCI Express and 2x PCI |
| Supply voltage | 100/240 V AC industrial power supply unit |
| Mounting | For horizontal and vertical installation; prepared for telescopic rails |
| Protection | IP30 at the front; IP20 at the rear |
| Lifecycle | Announcement of product phase-out |
Key Features
Intel Core i3-10100E, 4C/8T, 3.2 (3.8) GHz, 6 MB cache, with 4 GB DDR4 SDRAM in a single-channel configuration.
1 TB HDD, 3.5" SATA.
2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0, 2x USB 3.1 Gen. 1, 1x internal USB 2.0, and 7 slots: 5x PCI Express and 2x PCI.
Rack PC, 19", 4 U, with an enclosure with drive support Type B for internal installation; the enclosure is specified for 0.2 g vibration and 2 g shock.
100/240 V AC industrial power supply unit with temperature and fan monitoring plus watchdog.
Without power supply cable, expansion, expansions and operating system.
Frequently Asked Questions
What is the exact product configuration?
It is Siemens 6AG4104-5CA10-0AX0, a SIMATIC IPC547J rack PC with an Intel Core i3-10100E, 4 GB DDR4 SDRAM, a 1 TB 3.5" SATA HDD and a 100/240 V AC industrial power supply unit.
Which interfaces are included?
The configuration includes 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0, 2x USB 3.1 Gen. 1, 1x internal USB 2.0 and COM1.
How can the rack PC be installed?
It supports horizontal and vertical installation, is prepared for telescopic rails, and has a removable 19" mounting bracket.
What is excluded from this configuration?
It is without a power supply cable, expansion, expansions and operating system.
Can this line item be included in a project quotation?
Yes. Submit the requested quantity, destination, schedule context and any additional BOM lines for quotation review.
