Product Overview
Technical Summary
| Product type | IPC547J |
|---|---|
| Design | Rack PC, 19", 4 U |
| Processor | Intel Core i5-10500E (6C/12T, 3.1 (4.2) GHz, 12 MB Cache) |
| Main memory | 16 GB DDR4 SDRAM (2x 8 GB), dual channel |
| Hard disk | 1 TB HDD 3.5" SATA |
| Chipset | H410 |
| Ethernet interfaces | 2x Gbit Ethernet |
| USB interfaces | 4x USB 2.0; 2x USB 3.1 Gen. 1; 1x USB 2.0 internal |
| Expansion slots | 5x PCI Express, 2x PCI |
| Supply voltage | 100/240 V AC (autorange) 50 / 60 Hz |
| Mounting | For horizontal and vertical installation; prepared for telescopic rails |
| Protection | IP30 at the front; IP20 at the rear |
Key Features
Intel Core i5-10500E with 6C/12T, 3.1 (4.2) GHz and 12 MB cache; 16 GB DDR4 SDRAM as 2x 8 GB in dual channel.
1 TB HDD, 3.5" SATA.
19", 4 U rack PC with a short enclosure and drive support Type C for internal installation; the enclosure is blue chromated.
H410 mainboard with 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0, 2x USB 3.1 Gen. 1 and 1x internal USB 2.0.
7 slots: 5x PCI Express and 2x PCI; temperature and fan monitoring and a watchdog are provided.
100/240 V AC industrial power supply unit with China power supply cable; supplied without expansion and without operating system.
Frequently Asked Questions
What exact configuration does Siemens 6AG4104-5DA03-2AX0 represent?
It is a SIMATIC IPC547J with an Intel Core i5-10500E, 16 GB DDR4 SDRAM (2x 8 GB), a 1 TB HDD 3.5" SATA, an H410 mainboard, a short enclosure and a China power supply cable.
Which interfaces are provided on the H410 configuration?
It has 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0, 2x USB 3.1 Gen. 1, 1x internal USB 2.0, COM1 and audio line in, line out and microphone.
How can this rack PC be mounted?
It supports horizontal and vertical installation, is prepared for telescopic rails, and has a removable 19" mounting bracket. The tower kit is optional.
What is excluded from this configuration?
It is without expansion, without expansions and without an operating system.
What project details should accompany a quotation request?
Provide the requested quantity, destination, schedule context and any additional BOM lines for review.
