Product Overview
Technical Summary
| Motor type | SIMOTICS M compact asynchronous motor |
|---|---|
| Speed and output | 1000 r/min: 17 kW; 1150 r/min: 19.5 kW; 1350 r/min: 22 kW; 1500 r/min: 24 kW |
| Torque | 1000 r/min: 162 Nm; 1150 r/min: 162 Nm; 1350 r/min: 156 Nm; 1500 r/min: 153 Nm |
| Current and voltage | 1000 r/min: 43 A, 307 V; 1150 r/min: 43 A, 350 V; 1350 r/min: 42 A, 404 V; 1500 r/min: 41 A, 447 V |
| Cooling | Forced ventilation |
| Protection | IP55 degree of protection |
| Feedback | Incremental Encoder SIN/COS 1 VPP 2048 S/R with C and D track (Encoder IC2048S/R) |
| Temperature sensor | KTY 84-130 |
| Mounting | DESIGN IM B5 (IMV 1,IM V3) |
| Shaft | Plain shaft WITHOUT FITTED KEY |
| Connections | Terminal box above; cable entry on the right; signal connection D-END |
Key Features
17 kW, 162 Nm, 43 A, and 307 V at 1000 r/min; 19.5 kW, 162 Nm, 43 A, and 350 V at 1150 r/min; 22 kW, 156 Nm, 42 A, and 404 V at 1350 r/min; 24 kW, 153 Nm, 41 A, and 447 V at 1500 r/min.
Forced ventilation and IP55 degree of protection.
Incremental Encoder SIN/COS 1 VPP 2048 S/R with C and D track, Encoder IC2048S/R, and temperature sensor KTY 84-130.
DESIGN IM B5 (IMV 1,IM V3), plain shaft WITHOUT FITTED KEY, standard bearing, vibration severity grade S/A, and shaft and flange accuracy R.
Terminal box above, cable entry on the right, and signal connection D-END.
Product cancellation.
Frequently Asked Questions
What is the exact Siemens motor line item?
It is Siemens 1PH8137-1MD02-0HA1, a SIMOTICS M compact asynchronous motor.
What feedback and temperature sensor does this motor have?
It has an incremental Encoder SIN/COS 1 VPP 2048 S/R with C and D track (Encoder IC2048S/R) and a KTY 84-130 temperature sensor.
What mechanical configuration should be retained in the quotation?
Retain DESIGN IM B5 (IMV 1,IM V3), a plain shaft WITHOUT FITTED KEY, standard bearing, vibration severity grade S/A, and shaft and flange accuracy R.
What project details should accompany a quotation request for this line item?
Provide the requested quantity, destination, schedule context, and any additional BOM lines.
