Product Overview
Technical Summary
| Speed and rating variants | 1500 r/min: 101 kW, 643 Nm, 235 A, 271 V; 1750 r/min: 117 kW, 638 Nm, 235 A, 315 V; 2000 r/min: 118 kW, 563 Nm, 210 A, 355 V |
|---|---|
| Feedback | Incremental encoder SIN/COS 1 VPP, 2048 S/R, with C and D track; encoder IC2048S/R |
| Temperature sensor | KTY 84-130 |
| Cooling | Forced ventilation, air-flow direction DE–>NDE |
| Degree of protection | IP55 |
| Mounting and shaft | Design IM B5 with flange A550 (IM V3); shaft with fitted key and half-key balancing |
| Terminal box and cable entry | Terminal box above; cable entry on the right; signal connection D-end |
| Lifecycle | Product cancellation |
Key Features
1500 r/min: 101 kW, 643 Nm, 235 A, 271 V; 1750 r/min: 117 kW, 638 Nm, 235 A, 315 V; 2000 r/min: 118 kW, 563 Nm, 210 A, 355 V.
Incremental encoder SIN/COS 1 VPP, 2048 S/R, with C and D track; encoder IC2048S/R.
Temperature sensor KTY 84-130.
Forced ventilation with air-flow direction DE–>NDE; degree of protection IP55.
Design IM B5 with flange A550 (IM V3); shaft with fitted key and half-key balancing.
Terminal box above, cable entry on the right, signal connection D-end; bearing standard, vibration severity grade R/A, shaft and flange accuracy grade R.
Frequently Asked Questions
Which ratings are associated with 1PH8224-2MF02-2BA1?
The motor has three stated rating variants: 1500 r/min at 101 kW, 643 Nm, 235 A, 271 V; 1750 r/min at 117 kW, 638 Nm, 235 A, 315 V; and 2000 r/min at 118 kW, 563 Nm, 210 A, 355 V.
What feedback and temperature-sensing equipment does it have?
It has an incremental encoder SIN/COS 1 VPP, 2048 S/R, with C and D track, encoder IC2048S/R, and a KTY 84-130 temperature sensor.
What mechanical configuration and connections are specified?
It has design IM B5 with flange A550 (IM V3), a shaft with fitted key and half-key balancing, a terminal box above, cable entry on the right, and signal connection D-end.
What should be included with this line item in a quotation request?
Include the requested quantity, destination, schedule context, and any additional BOM lines for review.
