Product Overview
Technical Summary
| Product type | SIMATIC Field PG M6 Advanced programming notebook |
|---|---|
| Processor | i7-8850H; 2.6 to 4.3 GHz; 6 cores and hyper-threading; 9 MB Smart Cache |
| Display | 15.6" Full HD, 16:9 format |
| Display resolution | 1 920 × 1 080 pixel |
| Memory | 1x 32 GB DDR4 SD-RAM SO-DIMM |
| Storage | 2 TB SSD SATA (2.5") |
| PROFIBUS interface | 1x PROFIBUS DP / MPI; 9-pin Sub-D socket; 9.6 kBaud to 12 MBaud |
| USB interfaces | 4; 3x Type A and 1x USB 3.1 Gen. 2 Type C |
| Industrial Ethernet | 100 Mbps and 1000 Mbps |
| Supply voltage | 100 V to 240 V AC; ±10 %, sinusoidal |
| Operating system | Windows 11 IoT Enterprise version 22H2 64-bit |
Key Features
Intel i7-8850H; 2.6 to 4.3 GHz; 6 cores and hyper-threading; 9 MB Smart Cache.
15.6" Full HD display in 16:9 format with 1 920 × 1 080 pixel resolution and 300 cd/m2 luminance.
1x 32 GB DDR4 SD-RAM SO-DIMM and 2 TB SSD SATA (2.5").
1x PROFIBUS DP / MPI with 9-pin Sub-D socket, 1x RS 232, 4 USB interfaces, DVI-I, DisplayPort and Industrial Ethernet up to 1000 Mbps.
Windows 11 IoT Enterprise version 22H2 64-bit; trial licenses for STEP 7 Professional Combo, WinCC Advanced Combo and Safety Advanced Combo; preinstalled software and licenses version V18.
Without S5 interface, without NVME (M.2) and without USB flash drive for restore image and D&D.
Frequently Asked Questions
What is the exact Siemens line item?
The exact line item is 6ES7718-1CC06-0CA3, SIMATIC Field PG M6 Advanced.
What processor, memory and storage does this configuration have?
It has an i7-8850H processor, 1x 32 GB DDR4 SD-RAM SO-DIMM and a 2 TB SSD SATA (2.5").
Which communication interfaces are included?
It has 1x PROFIBUS DP / MPI, 1x RS 232, 4 USB interfaces and Industrial Ethernet at 100 Mbps and 1000 Mbps.
Which items are excluded from the configuration?
It is without S5 interface, without NVME (M.2) and without USB flash drive for restore image and D&D.
What project details should accompany a quotation request?
Please provide the requested quantity, destination, schedule context and any additional BOM lines.
