Product Overview
Technical Summary
| Product type designation | IPC477E |
|---|---|
| Display | 15" TFT touch; 1280 x 800 resolution |
| Processor | Core i3-6102E (2C/4T, 1.9 GHz, 3 MB Cache) |
| Main memory | 8 GB DDR4-2400 SO-DIMM |
| Solid-state drive | 240 GB SATA |
| Industrial Ethernet interfaces | 3; 3x Ethernet (RJ45) |
| Graphics interfaces | 2x DisplayPort |
| Supply | 24 V DC industrial power supply; 24 V; PELV / SELV floating |
| Mounting | For horizontal and vertical mounting; portrait-format mounting possible |
| Protection | IP65 at the front; IP20 at the rear |
| Operating system | Windows7 Ultimate SP1, 64-bit, MUI (de, en, es, fr, it) |
| Product lifecycle | Product cancellation |
Key Features
15" touch display with 1280 x 800 resolution; analog, resistive touch operation.
Core i3-6102E processor with 2C/4T, 1.9 GHz, and 3 MB Cache; 8 GB DDR4-2400 SO-DIMM main memory.
3 industrial Ethernet interfaces with 3x Ethernet (RJ45); 100 Mbps and 1000 Mbps supported.
240 GB SATA solid-state drive; without replaceable mass storage.
24 V DC industrial power supply; for horizontal and vertical mounting, with portrait-format mounting possible.
IP65 at the front and IP20 at the rear; without RS 232/RS485, without PCIe, and without SIMATIC software.
Frequently Asked Questions
What is the exact product type for Siemens 6AV7241-3BB04-0FA0?
The product type designation is IPC477E, a SIMATIC IPC 477E panel PC.
What display and computing configuration does this line item have?
It has a 15" touch display with 1280 x 800 resolution, a Core i3-6102E processor, 8 GB memory, and a 240 GB SATA solid-state drive.
Which interfaces are included?
It has 3 industrial Ethernet interfaces with 3x Ethernet (RJ45), 2x DisplayPort, and front USB plus 4 USB at the back.
What is the mounting and protection configuration?
It is for horizontal and vertical mounting, portrait-format mounting is possible, and protection is IP65 at the front and IP20 at the rear.
What should be specified for a project quotation?
Specify the requested quantity, destination, schedule, and whether additional BOM lines should be included.
