Product Overview
Technical Summary
| Product type | IPC477E |
|---|---|
| Display | 15" TFT touch |
| Resolution | 1 280 pixel horizontal; 800 pixel vertical |
| Processor | Core i3-6102E (2C/4T, 1.9 GHz, 3 MB Cache) |
| Main memory | 16 GB DDR4-2400 SO-DIMM |
| Industrial Ethernet | 3x Ethernet (RJ45); 100 Mbps and 1000 Mbps |
| Operating system | Windows 10 IoT Enterprise 2016 LTSB (64-bit) for Celeron, i3 and i5 |
| Storage configuration | 240 GB solid-state drive SATA; without replaceable mass storage |
| Serial interface | Without RS 232/RS485 |
| Supply | 24 V DC industrial power supply |
| Mounting and protection | Panel PC, built-in unit; horizontal or vertical mounting; IP65 front, IP20 rear |
Key Features
15" TFT touch display with 1 280 pixel horizontal resolution and 800 pixel vertical resolution; analog, resistive touch operation.
Core i3-6102E processor with 2C/4T, 1.9 GHz and 3 MB Cache; 16 GB DDR4-2400 SO-DIMM main memory.
3 industrial Ethernet interfaces with 3x Ethernet (RJ45); 100 Mbps and 1000 Mbps supported.
Windows 10 IoT Enterprise 2016 LTSB (64-bit) for Celeron, i3 and i5.
24 V DC industrial power supply; rated value 24 V, PELV / SELV floating.
Panel PC, built-in unit for horizontal and vertical mounting; portrait format possible; IP65 at the front and IP20 at the rear.
Frequently Asked Questions
What display is included with Siemens 6AV7241-3BC07-0FA0?
It has a 15" TFT analog resistive touch display with 1 280 pixel horizontal resolution and 800 pixel vertical resolution.
Which processor and memory configuration does this line item have?
It has a Core i3-6102E processor with 2C/4T, 1.9 GHz and 3 MB Cache, plus 16 GB DDR4-2400 SO-DIMM main memory.
Which Ethernet interfaces are available?
It has 3 industrial Ethernet interfaces with 3x Ethernet (RJ45), supporting 100 Mbps and 1000 Mbps.
Does the configuration include serial interfaces or PCIe?
It is without RS 232/RS485 and without PCIe.
Can this exact line item be added to a project quotation?
Yes. Submit the requested quantity, destination, schedule context, and any additional BOM lines for quotation review.
