Product Overview
Technical Summary
| Product type | IPC477E |
|---|---|
| Display | 19" TFT touch, 1366 x 768 |
| Processor | Core i3-6102E (2C/4T, 1.9 GHz, 3 MB Cache) |
| Main memory | 16 GB |
| Storage | 320 GB HDD SATA; without replaceable mass storage |
| Industrial Ethernet | 3x Ethernet (RJ45), 100 Mbps and 1000 Mbps |
| Serial interfaces | 2x RS232/RS485 |
| Expansion slot | 1x PCIe (x4) |
| Power supply | 24 V DC industrial power supply |
| Operating system | Windows7 Ultimate SP1, 64-bit, MUI (de, en, es, fr, it) |
| Protection | IP65 at the front; IP20 at the rear |
| Lifecycle | Product cancellation |
Key Features
19" TFT touch display with 18.5 in screen diagonal, 1 366 pixel horizontal resolution and 768 pixel vertical resolution; analog, resistive touch operation.
Core i3-6102E processor (2C/4T, 1.9 GHz, 3 MB Cache) with 16 GB main memory.
3x Gigabit Ethernet (IE/PN) with 3 industrial Ethernet interfaces using RJ45 connectors; 100 Mbps and 1000 Mbps supported.
320 GB HDD SATA; without replaceable mass storage.
2x RS232/RS485 and 1x PCIe (x4); the order configuration has 2x COM selectable in the BIOS and 1 PCIe slot.
24 V DC industrial power supply; panel PC built-in unit for horizontal and vertical mounting, with portrait format possible; IP65 at the front and IP20 at the rear.
Frequently Asked Questions
What exact display configuration does 6AV7241-3DC44-0JA0 have?
It has a 19" TFT touch display with 18.5 in screen diagonal, 1 366 pixel horizontal resolution, 768 pixel vertical resolution and analog, resistive touch operation.
Which interfaces are included in this line-item configuration?
The configuration includes 3x Gigabit Ethernet (IE/PN), 2x RS232/RS485, 2x DisplayPort and 1x PCIe (x4).
Does this configuration include SIMATIC software or replaceable mass storage?
It is without SIMATIC software and without replaceable mass storage; the configuration has a 320 GB HDD SATA.
What quantity, destination and schedule should be included in a project quotation?
Please provide the requested quantity, destination and schedule context with this line item.
Do you have additional BOM lines for the quotation?
Please include any additional BOM lines with the project list.
