Product Overview
Technical Summary
| Product type | IPC477E |
|---|---|
| Display | 19" TFT touch |
| Resolution | 1 366 x 768 pixel |
| Processor | Core i5-6442EQ (4C/4T, 1.9 (2.7) GHz, 6 MB Cache, iAMT) |
| Main memory | 8 GB DDR4-2400 SO-DIMM |
| Industrial Ethernet | 3x Ethernet (RJ45); 100 Mbps and 1000 Mbps |
| Serial interface | 2x COM (RS 232 / 422 / 485), selectable in the BIOS |
| Supply voltage | 100/240 V AC (autorange) 50/60 Hz; optional 24 V DC |
| Mounting | For horizontal and vertical mounting; panel PC, built-in unit |
| Protection | IP65 at the front; IP20 at the rear |
| Lifecycle | Announcement of product phase-out |
Key Features
19" TFT touch display with 1 366 x 768 pixel resolution; analog, resistive touch operation.
Core i5-6442EQ processor; 8 GB DDR4-2400 SO-DIMM main memory.
3 industrial Ethernet interfaces with 3x Ethernet (RJ45); 100 Mbps and 1000 Mbps supported.
2x COM with RS 232 / 422 / 485, selectable in the BIOS.
Panel PC, built-in unit for horizontal and vertical mounting; IP65 at the front and IP20 at the rear.
Without operating system, replaceable mass storage, internal mass storage, SIMATIC software, and power supply cord; without PCIe.
Frequently Asked Questions
What exact product is 6AV7241-5DB30-0AA1?
It is a Siemens SIMATIC IPC 477E Panel PC with a 19" TFT touch display, Core i5-6442EQ processor, 8 GB memory, 3x Ethernet, and 2x RS 232/RS 485 interfaces.
Which display and mounting details should be retained for this line item?
The display is 19" TFT touch with 1 366 x 768 pixel resolution. The unit is for horizontal and vertical mounting and is a panel PC, built-in unit; portrait-format mounting is possible.
Which interfaces are included?
It has 3x Ethernet (RJ45), 2x COM with RS 232 / 422 / 485 selectable in the BIOS, and 2x DisplayPort.
What is excluded from this configuration, and what project details should be submitted?
It is without an operating system, replaceable mass storage, internal mass storage, SIMATIC software, PCIe, and power supply cord. Submit the requested quantity, destination, schedule, and any additional BOM lines.
