Product Overview
Technical Summary
| Product type designation | IPC477E |
|---|---|
| Display | 19" TFT touch; 1 366 x 768 pixel |
| Processor | Core i5-6442EQ, 4C/4T, 1.9 (2.7) GHz, 6 MB Cache, iAMT |
| Main memory | 16 GB DDR4-2400 SO-DIMM; ECC optional |
| Storage | 320 GB HDD SATA; without replaceable mass storage |
| Industrial Ethernet | 3; 3x Ethernet (RJ45); 100 Mbps and 1000 Mbps |
| Supply | 24 V DC industrial power supply; PELV / SELV floating |
| Mounting | Panel PC, built-in unit; horizontal and vertical mounting; portrait format possible |
| Protection | IP65 at the front; IP20 at the rear |
| Product lifecycle | Announcement of product phase-out |
Key Features
19" TFT touch display with 1 366 x 768 pixel resolution; analog, resistive touch screen.
Core i5-6442EQ processor and 16 GB memory; DDR4-2400 SO-DIMM, with ECC optional.
3x Gbit Ethernet (IE/PN) using 3x Ethernet (RJ45); 100 Mbps and 1000 Mbps supported.
320 GB HDD SATA; Windows 10 Enterprise 2019 LTSC (64-bit), MUI (en,de,fr,it,es); without SIMATIC software and without replaceable mass storage.
24 V DC industrial power supply; rated value 24 V, PELV / SELV floating.
Panel PC, built-in unit for horizontal and vertical mounting, with portrait format possible; IP65 at the front and IP20 at the rear.
Frequently Asked Questions
What exact product type is this line item?
It has product type designation IPC477E and order number 6AV7241-5DC05-0JA0.
Which display configuration does it have?
It has a 19" TFT touch display with 1 366 x 768 pixel resolution and analog, resistive touch operation.
Which interfaces are included?
It has 3x Ethernet (RJ45), 2x DisplayPort and a serial interface without RS 232/RS485; 2x COM (RS 232 / 422 / 485) is selectable in the BIOS.
Which mounting and protection details should be retained?
It is a built-in Panel PC for horizontal and vertical mounting, with portrait format possible; protection is IP65 at the front and IP20 at the rear.
What should I provide for a project quotation?
Provide the requested quantity, destination, schedule context and any additional BOM lines for review.
