Product Overview
Technical Summary
| Product line item | 6AV7241-5GB05-0GA0 |
|---|---|
| Display | 19" TFT multi-touch |
| Display resolution | 1 920 pixel × 1 080 pixel |
| Processor | Core i5-6442EQ |
| Memory | 8 GB |
| Ethernet interfaces | 3x Gbit Ethernet (IE/PN) |
| Rear USB | 4 USB |
| Operating system | Windows 10 Enterprise 2019 LTSC (64-bit), MUI (en,de,fr,it,es) |
| Storage | 480 GB solid-state drive SATA |
| Supply | 24 V DC industrial power supply |
| Mounting cutout | 448 mm × 278 mm |
Key Features
19" TFT multi-touch display with 1 920 pixel horizontal and 1 080 pixel vertical image resolution; projective-capacitive touch operation.
Core i5-6442EQ processor and 8 GB memory.
3x Gbit Ethernet (IE/PN); the collected description also specifies Ethernet (10/100/1000) and 4 USB on the back.
Windows 10 Enterprise 2019 LTSC (64-bit), MUI (en,de,fr,it,es); 480 GB solid-state drive SATA; without replaceable mass storage and without SIMATIC software.
24 V DC industrial power supply; central design, portrait mounting possible; mounting cutout 448 mm × 278 mm and mounting depth 76 mm.
Frequently Asked Questions
What display configuration belongs to Siemens 6AV7241-5GB05-0GA0?
It has a 19" TFT multi-touch display with 1 920 pixel × 1 080 pixel resolution and projective-capacitive touch operation.
Which computing and storage configuration is included?
The configuration has a Core i5-6442EQ processor, 8 GB memory, Windows 10 Enterprise 2019 LTSC (64-bit), MUI (en,de,fr,it,es), and a 480 GB solid-state drive SATA. It is without SIMATIC software and without replaceable mass storage.
Which interfaces and supply are provided?
It has 3x Gbit Ethernet (IE/PN), Ethernet (10/100/1000), 4 USB on the back, and a 24 V DC industrial power supply. It is without RS 232/RS485 and without PCIe.
How is this line item mounted?
It uses a central design, supports portrait mounting, and has a 448 mm × 278 mm mounting cutout with 76 mm mounting depth.
What should I provide for a project quotation?
Provide the requested quantity, destination, schedule context, and any additional BOM lines for quotation review.
