Product Overview
Technical Summary
| Product type designation | IPC477E |
|---|---|
| Display | 19" TFT multi-touch; 1366 x 768 |
| Processor | Core i5-6442EQ |
| Main memory | 16 GB |
| Storage | 480 GB solid-state drive SATA |
| Operating system | Windows 10 IoT Enterprise 2016 LTSB (64-bit) |
| Ethernet interfaces | 3x Gbit Ethernet (IE/PN); Ethernet 10/100/1000 |
| Serial interfaces | 2x RS 232/RS 485 |
| Power supply | 24 V DC industrial power supply |
| Mounting | Horizontal and vertical mounting; portrait format possible |
| Protection | IP65 at the front; IP20 at the rear |
| Product lifecycle | Announcement of product phase-out |
Key Features
19" TFT multi-touch display with 1366 x 768 resolution and projective-capacitive touch operation.
Core i5-6442EQ processor with 16 GB memory.
480 GB SATA solid-state drive and Windows 10 IoT Enterprise 2016 LTSB (64-bit); without replaceable mass storage and without SIMATIC software.
4 USB at the back, Ethernet 10/100/1000, 3x Gbit Ethernet (IE/PN), and 2x RS 232/RS 485.
Panel PC built-in unit for horizontal and vertical mounting, with portrait mounting possible; IP65 at the front and IP20 at the rear.
24 V DC industrial power supply; without PCIe.
Frequently Asked Questions
What exact configuration does 6AV7241-5KC37-0GA0 have?
It has a Core i5-6442EQ, 16 GB memory, a 480 GB SATA solid-state drive, Windows 10 IoT Enterprise 2016 LTSB (64-bit), and a 24 V DC industrial power supply.
Which display and interfaces are included?
The configuration has a 19" TFT multi-touch display with 1366 x 768 resolution, 4 USB at the back, Ethernet 10/100/1000, 3x Gbit Ethernet (IE/PN), and 2x RS 232/RS 485.
Is PCIe included in this configuration?
It is without PCIe.
How is this Panel PC mounted and protected?
It is a built-in Panel PC for horizontal and vertical mounting, with portrait mounting possible. Protection is IP65 at the front and IP20 at the rear.
Can I submit quantity, destination, schedule, and additional BOM lines with this item?
Yes. Include the requested quantity, destination, schedule context, and any additional BOM lines in the project quotation request.
