Product Overview
Technical Summary
| Product type | SIMATIC IPC647D |
|---|---|
| Selected processor | Core i5-4570TE (2C/4T, 2.7 (3.3) GHz, 4 MB cache, TB, VT-D, AMT) |
| Main memory | 4 GB DDR3 SD-RAM (2x 2 GB) |
| Storage | 2x 1 TB HDD SATA, in removable frame |
| Ethernet interfaces | 2x Gbit Ethernet (IE/PN), RJ45 |
| Video interfaces | 1x DVI-I and 2x DisplayPort |
| USB interfaces | 4x USB 3.0, including 1x internal; 3x USB 2.0 |
| Power supply | 110/240V industrial power supply unit; with NAMUR, Power supply cable China |
| Mounting | For horizontal installation; prepared for telescopic rails; 19-inch mounting bracket can be removed externally |
| Protection | IP41 at the front; IP20 at the rear |
| Lifecycle | Product cancellation |
Key Features
Core i5-4570TE with 2C/4T, 2.7 (3.3) GHz, 4 MB cache, TB, VT-D and AMT; 4 GB DDR3 SD-RAM in 2x 2 GB.
2x 1 TB HDD SATA in a removable frame.
2x Gbit Ethernet (IE/PN) with RJ45 connectors.
1x DVI-I, 2x DisplayPort, 1x COM 1, 2x PS/2, audio, 4x USB 3.0 including 1x internal, and 3x USB 2.0.
19-inch, 2U Rack PC for horizontal installation; prepared for telescopic rails. Temperature and fan monitoring are included.
The configuration is without a fieldbus, operating system, software, hardware expansions and expansion (HW).
Frequently Asked Questions
What exact Siemens line item is this?
It is Siemens 6AG4112-2GM22-0XX5, a SIMATIC IPC647D Rack PC.
Which processor, memory and storage are included in this configuration?
It has a Core i5-4570TE processor, 4 GB DDR3 SD-RAM (2x 2 GB), and 2x 1 TB HDD SATA in a removable frame.
Which network and video interfaces does it have?
It has 2x Gbit Ethernet (IE/PN) with RJ45, 1x DVI-I, and 2x DisplayPort.
Which mounting details should be retained in the BOM?
It is for horizontal installation, prepared for telescopic rails, with a removable 19-inch mounting bracket.
What is excluded from the configuration?
It is without a fieldbus, operating system, software, hardware expansions and expansion (HW). Include quantity, destination, schedule and any additional BOM lines in the inquiry.
