Product Overview
Technical Summary
| Product type | IPC647D |
|---|---|
| Design | Rack PC, 19", 2U |
| Installation | Horizontal installation; prepared for telescopic rails |
| Processor | Core i5-4570TE (2C/4T, 2.7 (3.3) GHz, 4 MB cache, TB, VT-D, AMT) |
| Main memory | 8 GB DDR3 SD-RAM (2x 4 GB) |
| Storage | 2x 1 TB HDD SATA, in removable frame |
| Interfaces | 2x Gigabit Ethernet; 2x DisplayPort; 1x DVI-I; 1x COM1; 2x PS/2; 7x USB; audio |
| Supply voltage | 100/240 V AC (autorange) 50 / 60 Hz |
| Monitoring | Temperature monitoring; fan monitoring; watchdog |
| Protection | IP41 at the front; IP20 at the rear |
| Lifecycle | Product cancellation |
Key Features
19-inch, 2U Rack PC for horizontal installation; prepared for telescopic rails, with an externally removable 19-inch mounting bracket.
2x Gigabit Ethernet, 2x DisplayPort, 1x DVI-I, 2x PS/2, audio, 7x USB, and 1x COM1; PROFIBUS or PROFINET is optional.
The supplied configuration has 2x 1 TB HDD SATA in a removable frame and 8 GB DDR3 SD-RAM (2x 4 GB), with a dual-channel bus module.
Core i5-4570TE with 2C/4T, 2.7 (3.3) GHz, 4 MB cache, TB, VT-D, and AMT.
Temperature monitoring, fan monitoring, watchdog, IP41 at the front, and IP20 at the rear.
100/240 V AC autorange supply at 50 / 60 Hz; optional redundant 100/240 V AC supply. Mains/voltage failure stored energy time: 20 ms.
Frequently Asked Questions
What exact product is this line item?
It is Siemens 6AG4112-2GM32-0XX5, SIMATIC IPC647D, a 19-inch, 2U Rack PC.
What storage and memory configuration does this line item have?
It has 2x 1 TB HDD SATA in a removable frame and 8 GB DDR3 SD-RAM (2x 4 GB).
Which interfaces are included?
It has 2x Gigabit Ethernet, 2x DisplayPort, 1x DVI-I, 1x COM1, 2x PS/2, audio, and 7x USB. PROFIBUS or PROFINET is optional.
How is the Rack PC mounted?
It is for horizontal installation, is prepared for telescopic rails, and has a 19-inch mounting bracket that can be removed externally.
What project details should accompany a quotation request?
Provide the requested quantity, destination, schedule context, and any additional BOM lines.
