Product Overview
Technical Summary
| Product type | IPC647E |
|---|---|
| Design | Rack PC, 19", 2U |
| Mounting | For horizontal installation; prepared for telescopic rails; 19" mounting bracket can be removed externally |
| Supply voltage | 100/240 V AC (autorange) 50 / 60 Hz |
| Processor | Intel Core i3-8100 (4C/4T, 3.6 GHz, 6 MB Cache, VT-d) |
| Main memory | 4 GB DDR4 SDRAM (1x 4 GB), Single Channel |
| Hard disk | 2x 1 TB 3.5" SATA HDD |
| Interfaces | 3x Gigabit Ethernet (IE/PN), RJ45; 2x DisplayPort; 1x DVI-D; 1x COM1; audio; 4x USB 3.1; 2x USB 3.1 (Typ C) rear side; 2x USB 3.0 front; 1x USB3.1 internally |
| Internal slot | 1x M.2 Slot internally |
| Monitoring | Temperature and fan monitoring; watchdog |
| Configuration exclusions | Without expansion (HW); without operating system; without expansions |
Key Features
SIMATIC IPC647E, 19", 2U, for horizontal installation; prepared for telescopic rails, with externally removable 19" mounting bracket.
Intel Core i3-8100 with 4C/4T, 3.6 GHz, and 6 MB cache; 4 GB DDR4 SDRAM, 1x 4 GB, Single Channel.
3x Gigabit Ethernet (IE/PN), RJ45; 2x DisplayPort, 1x DVI-D, 1x COM1, audio, 4x USB 3.1, 2x USB 3.1 (Typ C) rear side, 2x USB 3.0 front, and 1x USB3.1 internally.
2x 1 TB HDD 3.5" SATA; 1x M.2 Slot internally; Board 4 slots: 2x PCI, 4x PCIe x16 (8 L).
100/240 V AC industrial power supply unit; temperature and fan monitoring, watchdog, card retainer, and LED status display.
Without expansion (HW), without operating system, without expansions; power supply cable China.
Frequently Asked Questions
What is the exact product type for this line item?
It is the Siemens 6AG4112-3BC00-0XX3, SIMATIC IPC647E Rack PC, 19", 2U.
Which computing configuration is included?
The supplied configuration has an Intel Core i3-8100, 4 GB DDR4 SDRAM (1x 4 GB), 2x 1 TB 3.5" SATA HDD, and no operating system or hardware expansion.
Which interfaces and supply are included?
It has 3x Gigabit Ethernet (IE/PN), RJ45, 2x DisplayPort, 1x DVI-D, 1x COM1, audio, USB interfaces, and a 100/240 V AC industrial power supply unit.
What quantity, destination, schedule, and additional BOM lines should be included in an inquiry?
Provide the requested quantity, destination, schedule context, and any additional BOM lines with the exact product number.
