Product Overview
Technical Summary
| Product type | IPC647E |
|---|---|
| Design | Rack PC, 19", 2U |
| Processor | Intel Xeon E-2176G (6C/12T, 3.7 (4.7) GHz, 12 MB Cache, Turbo Boost 2.0, VT-x/-d-Technology, iAMT) |
| Main memory | 16 GB DDR4 SDRAM (2x 8 GB), Dual Channel |
| Storage | RAID1, 2x 1 TB HDD 3.5" SATA |
| Interfaces | 3x Gbit Ethernet (IE/PN), RJ45; 1x DVI-D, 2x DisplayPort, 1x COM1, audio, 4x USB 3.1, 2x USB 3.1 (Type C) rear side; 2x USB 3.0 front, 1x USB3.1 internally |
| Supply voltage | 100/240 V AC industrial power supply unit |
| Mounting | For horizontal installation; prepared for telescopic rails; 19" mounting bracket can be removed externally |
| Protection | IP41 at the front; IP20 at the rear |
| Lifecycle | Active Product |
Key Features
19", 2U enclosure for horizontal installation; prepared for telescopic rails, with a 19" mounting bracket that can be removed externally.
Intel Xeon E-2176G with 6C/12T, 3.7 (4.7) GHz, 12 MB cache, TB, VT-D and AMT; 16 GB DDR4 SDRAM in 2x 8 GB Dual Channel.
RAID1 with 2x 1 TB 3.5" SATA HDD.
3x Gbit Ethernet (IE/PN), RJ45; 1x DVI-D, 2x DisplayPort, 1x COM1, audio, 4x USB 3.1, 2x USB 3.1 Type C at the rear, 2x USB 3.0 at the front, and 1x USB 3.1 internally.
Temperature and fan monitoring, watchdog, card retainer, IP41 at the front and IP20 at the rear.
Without hardware expansion, without operating system, without expansions; power supply cable for China.
Frequently Asked Questions
What is the exact product type and form factor?
It has product type designation IPC647E and a Rack PC, 19", 2U design.
Which processor and memory are included in this configuration?
It includes an Intel Xeon E-2176G with 6C/12T, 3.7 (4.7) GHz and 12 MB cache, plus 16 GB DDR4 SDRAM in 2x 8 GB Dual Channel.
What storage configuration does this line item have?
It has RAID1 with 2x 1 TB 3.5" SATA HDD.
Which interfaces are available?
It has 3x Gbit Ethernet (IE/PN) with RJ45, 1x DVI-D, 2x DisplayPort, 1x COM1, audio, and the listed USB connections.
What should be included when requesting a quotation?
Provide the requested quantity, destination, schedule context, and any additional BOM lines.
