Product Overview
Applications
The installed S7-1500 Software Controller CPU 1505SP provides software-based control.
The controller supports PROFINET IO Controller and PROFINET IO Device communication.
Technical Summary
| Product type | CPU1515SP PC2 – IndOS |
|---|---|
| Installed software | SIMATIC Industrial OS V3.x; S7-1500 Software Controller CPU 1505SP V3x |
| Main memory | 8 GB RAM |
| CFast memory | 128 GB flash memory |
| Supply voltage | 24 V DC; permissible range 19.2 V to 28.8 V DC |
| Ethernet interfaces | 2 industrial Ethernet interfaces; 1 PROFINET interface |
| USB interfaces | 4; 2x USB 2.0, 2x USB 3.0 on front side |
| PROFINET IO Devices | 128 connectable; 64 with IRT |
| PROFINET update time | 500 μs to 8 ms for a 500 μs IRT send cycle |
| Operating ET 200SP modules | 64 maximum |
Key Features
CPU1515SP PC2 – IndOS with Intel Atom E3940, 1.6 GHz, 4 cores, 8 GB RAM and 128 GB CFast flash memory.
SIMATIC Industrial OS V3.x and S7-1500 Software Controller CPU 1505SP V3x are preinstalled; SIMATIC memory card is not required.
1x PROFINET connection for ET 200SP BusAdapter, 1x 10/100/1000 Mbps Ethernet, 2x USB 3.0, 2x USB 2.0, 1x DisplayPort and 1x SD/MMC slot.
Rated supply voltage: 24 V DC; permissible range: 19.2 V to 28.8 V DC; reverse polarity protection: Yes.
PROFINET IO Controller and IO Device are supported, with up to 128 connectable IO Devices and up to 64 IO Devices with IRT.
Frequently Asked Questions
What exact Siemens line item is this?
It is 6ES7677-2DB43-0GB1, a SIMATIC ET 200SP Open Controller with CPU1515SP PC2 – IndOS.
What memory configuration does it have?
It has 8 GB RAM and 128 GB CFast flash memory. A SIMATIC memory card is not required.
Which interfaces are available?
It has 1 PROFINET connection for an ET 200SP BusAdapter, 1 Ethernet interface, 4 USB interfaces, 1 DisplayPort and 1 SD/MMC slot.
What supply voltage does the configuration use?
The rated supply voltage is 24 V DC, with a permissible range of 19.2 V to 28.8 V DC.
Can this line item be included in a project quotation?
Yes. Submit the requested quantity, destination, schedule context and any additional BOM lines for quotation review.
