Product Overview
Applications
Used for inserting S7-1500 I/O modules in the ET 200MP with IM 155-5 PN HF from FW V4.4.1.
Supports hot swapping of inserted S7-1500 I/O modules.
Technical Summary
| Product type | Active Backplane ST 1+8 Slot |
|---|---|
| Slot capacity | 9 slots |
| CPU slots, max. | 1; for S7-1500H CPU with CPU firmware V3.1 or higher; interface modules up to V1.1.0 only (active backplane bus) |
| IM slots, max. | 1 |
| PS slots, max. | 8; Max. 2 PS per station |
| IO/CM/CP/TM slots, max. | 8 |
| F-IO slots, max. | 8 |
| Power consumption from the backplane bus | 2 W |
| Operating ambient temperature | -30 °C to 60 °C horizontal installation; -30 °C to 40 °C vertical installation |
Key Features
Active Backplane ST 1+8 Slot for inserting S7-1500 I/O modules and supporting hot swapping.
9 slots; maximum 1 CPU, 1 IM, 8 PS with maximum 2 PS per station, 8 IO/CM/CP/TM, and 8 F-IO.
Power consumption from the backplane bus: 2 W; typical power loss: 2 W.
Firmware version from V1.0.0; firmware update possible. STEP 7 TIA Portal configurable/integrated from V16 / V17 and STEP 7 from V5.6 and higher.
During operation: -30 °C to 60 °C with horizontal installation, and -30 °C to 40 °C with vertical installation.
294 mm width, 99 mm height, 14 mm depth, and approximately 246 g weight.
Frequently Asked Questions
What is the exact product type of Siemens 6ES7590-0BH00-0AA0?
It is an Active Backplane ST 1+8 Slot.
How many slots does the active backplane have?
It has 9 slots, with maximum 1 CPU, 1 IM, 8 PS, 8 IO/CM/CP/TM, and 8 F-IO slots. The maximum PS configuration is 2 PS per station.
What are the operating temperature limits?
During operation, the range is -30 °C to 60 °C for horizontal installation and -30 °C to 40 °C for vertical installation.
Does the configuration include the S7-1500 mounting rail and slot covers?
It is without the S7-1500 mounting rail and slot covers; they are to be ordered separately.
What details should be included when requesting this line item?
Include the requested quantity, destination, schedule context, and any additional BOM lines for quotation review.
