Product Overview
Technical Summary
| Product type | SIMATIC IPC547J rack PC, 19", 4 U |
|---|---|
| Processor | Core i3-10100E, 4C/8T, 3.2 (3.8) GHz, 6 MB cache |
| Memory | 32 GB DDR4 SDRAM, 2x 16 GB, dual channel |
| Storage | 1 TB HDD 3.5 SATA; 512 GB SSD M.2 NVMe for operating system |
| Expansion slots | 7 slots: 5x PCI Express, 2x PCI |
| Ethernet | 2x Gbit Ethernet |
| Display interfaces | 1x DVI-D; 1x DisplayPort |
| USB interfaces | 2x USB 3.0 front; 4x USB 2.0; 2x USB 3.1 Gen. 1; 1x USB 2.0 internal |
| Power supply | 100/240 V AC industrial power supply unit; USA power supply cable |
| Enclosure | Short enclosure with drive support type C; blue chromated |
| Configuration | Without operating system and without expansions |
| Lifecycle | Announcement of product phase-out |
Key Features
SIMATIC IPC547J rack PC in a 19", 4 U short enclosure with drive support type C.
Core i3-10100E with 4C/8T, 3.2 (3.8) GHz and 6 MB cache; 32 GB DDR4 SDRAM using 2x 16 GB in dual-channel mode.
1 TB HDD 3.5 SATA and 512 GB SSD M.2 NVMe for the operating system; M.2 slots are occupied.
7 slots: 5x PCI Express and 2x PCI. Interfaces include 2x USB 3.0 on the front, COM1 and audio on the rear, 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0 and 2x USB 3.1 Gen. 1.
100/240 V AC industrial power supply unit with USA power supply cable; temperature and fan monitoring and watchdog are included.
Without operating system and without expansions. The 512 GB SSD is only with W480E chipset.
Frequently Asked Questions
What exact configuration does Siemens 6AG4104-5CA02-3CX0 have?
It is a SIMATIC IPC547J rack PC in a 19", 4 U short enclosure, with a Core i3-10100E, 32 GB DDR4 SDRAM, 1 TB HDD and 512 GB SSD M.2 NVMe.
How many expansion slots and interfaces does this line item provide?
It has 7 slots: 5x PCI Express and 2x PCI. Interfaces include 2x Gbit Ethernet, DVI-D, DisplayPort, USB, COM1 and audio.
Does the configuration include an operating system or expansions?
It is without an operating system and without expansions.
What information should I include for a project quotation?
Include the exact line item, requested quantity, destination, schedule context and any additional BOM lines.
