Product Overview
Technical Summary
| Product type | SIMATIC IPC547J rack PC, 19", 4 U |
|---|---|
| Processor | Core i5-10500E, 6C/12T, 3.1 (4.2) GHz, 12 MB cache |
| Main memory | 16 GB DDR4 SDRAM, 2x 8 GB, dual channel |
| Storage | 1 TB HDD 3.5" SATA |
| Supply voltage | 100/240 V AC autorange, 50 / 60 Hz |
| Interfaces | 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0, 2x USB 3.1 Gen. 1, 1x COM1 |
| Mounting | Horizontal or vertical installation; prepared for telescopic rails |
| Protection | IP30 at the front; IP20 at the rear |
| Exclusions | Without power supply cable and without expansions |
| Lifecycle | Announcement of product phase-out |
Key Features
Core i5-10500E with 6C/12T, 3.1 (4.2) GHz and 12 MB cache; 16 GB DDR4 SDRAM as 2x 8 GB, dual channel.
1 TB HDD, 3.5" SATA.
2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0, 2x USB 3.1 Gen. 1 and 1x COM1.
Rack PC, 19", 4 U; suitable for horizontal and vertical installation and prepared for telescopic rails. The 19" mounting bracket can be removed externally.
100/240 V AC autorange supply at 50 / 60 Hz; temperature and fan monitoring, watchdog and IP30 at the front and IP20 at the rear.
Windows 10 IoT Enterprise 2019 LTSC MUI, 64-bit for Core i3/i5, is included. The power supply cable and expansions are not included.
Frequently Asked Questions
What exact configuration does 6AG4104-5DA00-2AA0 identify?
It identifies a SIMATIC IPC547J rack PC with a Core i5-10500E processor, 16 GB DDR4 SDRAM, 1 TB HDD 3.5" SATA and a 100/240 V AC industrial power supply unit.
Which interfaces are available on this line item?
It has 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0, 2x USB 3.1 Gen. 1 and 1x COM1.
How can the rack PC be mounted?
It supports horizontal and vertical installation, is prepared for telescopic rails, and has a 19" mounting bracket that can be removed externally. A tower kit is optional.
What is excluded from the configuration?
It is without a power supply cable and without expansions.
What information should accompany a quotation request?
Provide the requested quantity, destination, schedule context and any additional BOM lines for project-list verification.
