Product Overview
Technical Summary
| Product type | IPC547J |
|---|---|
| Design | Rack PC, 19", 4U |
| Processor | Intel Core i5-10500E (6C/12T, 3.1 (4.2) GHz, 12 MB cache) |
| Main memory | 16 GB DDR4 SDRAM (2x 8 GB), dual channel |
| Storage | 2x 1 TB HDD 3.5 SATA |
| Power supply | 100/240 V AC industrial power supply unit |
| Front USB | 2x USB 3.0 |
| Expansion slots | 5x PCI Express, 2x PCI |
| Ethernet | 2x Gbit Ethernet |
| Operating system | Windows 10 IoT Enterprise 2019 LTSC MUI (en/de/fr/it/es), 64-bit for Core i3/i5 |
| Mounting | Horizontal and vertical installation; prepared for telescopic rails |
| Protection | IP30 at the front; IP20 at the rear |
Key Features
19-inch, 4U rack PC for horizontal or vertical installation; prepared for telescopic rails, with a removable 19-inch mounting bracket and optional tower kit.
Intel Core i5-10500E with 6C/12T, 3.1 (4.2) GHz and 12 MB cache; 16 GB DDR4 SDRAM as 2x 8 GB in dual-channel configuration.
2x 1 TB HDD 3.5 SATA.
2x USB 3.0 on the front; COM1 and audio on the rear; 5x PCI Express and 2x PCI slots; 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0 and 2x USB 3.1 Gen. 1.
100/240 V AC industrial power supply unit with China power supply cable.
Temperature and fan monitoring, watchdog, and Windows 10 IoT Enterprise 2019 LTSC MUI (en/de/fr/it/es), 64-bit for Core i3/i5; without expansion.
Frequently Asked Questions
What exact product is Siemens 6AG4104-5DB43-2AA0?
It is a SIMATIC IPC547J rack PC with a 19-inch, 4U design.
Which processor and memory are configured?
The configured line item has an Intel Core i5-10500E processor with 6C/12T, 3.1 (4.2) GHz and 12 MB cache, plus 16 GB DDR4 SDRAM as 2x 8 GB in dual-channel configuration.
Which storage is included?
It has 2x 1 TB HDD 3.5 SATA.
Which interfaces and slots does it have?
It has 2x USB 3.0 on the front, COM1 and audio on the rear, 5x PCI Express, 2x PCI, 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0 and 2x USB 3.1 Gen. 1.
What should I provide for a project quotation?
Provide the requested quantity, destination, schedule context, and any additional BOM lines.
