Product Overview
Technical Summary
| Product type | IPC547J |
|---|---|
| Processor | Intel Core i7-10700E (8C/16T, 2.9 (4.5) GHz, 16 MB cache) |
| Main memory | 16 GB DDR4 SDRAM (2x 8 GB), dual channel |
| Storage | 2x 1 TB HDD 3.5 SATA |
| Form factor | Rack PC, 19", 4U |
| Slots | 5x PCI Express, 2x PCI |
| Ethernet | 2x Gbit Ethernet |
| Video interfaces | 1x DVI-D, 1x DisplayPort |
| USB interfaces | 4x USB 2.0, 2x USB 3.1 Gen. 1, 1x USB 2.0 internal |
| Supply | 100/240 V AC industrial power supply unit |
| Installation | Horizontal and vertical installation; prepared for telescopic rails |
| Protection | IP30 at the front; IP20 at the rear |
Key Features
Intel Core i7-10700E with 8C/16T, 2.9 (4.5) GHz, 16 MB cache, and 16 GB DDR4 SDRAM in 2x 8 GB dual-channel configuration.
2x 1 TB HDD 3.5 SATA in an enclosure with drive support Type B for internal installation.
Rack PC, 19", 4U, with 7 slots: 5x PCI Express and 2x PCI.
2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0, 2x USB 3.1 Gen. 1, 1x internal USB 2.0, COM1, audio, temperature and fan monitoring, and watchdog.
100/240 V AC industrial power supply unit; supports horizontal and vertical installation, is prepared for telescopic rails, and has a removable 19" mounting bracket.
Without expansion, without operating system, and without expansions.
Frequently Asked Questions
What exact line item is this?
It is the Siemens 6AG4104-5EB13-2AX0, SIMATIC IPC547J rack PC, 19", 4U.
Which computing configuration is included?
It has an Intel Core i7-10700E, 16 GB DDR4 SDRAM in 2x 8 GB dual-channel configuration, and 2x 1 TB HDD 3.5 SATA.
Which interfaces are included?
It has 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0, 2x USB 3.1 Gen. 1, 1x internal USB 2.0, COM1, and audio.
How can the rack PC be installed?
It supports horizontal and vertical installation, is prepared for telescopic rails, and has a removable 19" mounting bracket.
What configuration items are excluded?
It is without expansion, without operating system, and without expansions. Include the required quantity, destination, schedule context, and any additional BOM lines in the inquiry.
