Product Overview
Technical Summary
| Product type | IPC547J |
|---|---|
| Design | Rack PC, 19", 4 U |
| Processor | Intel Core i7-10700E (8C/16T, 2.9 (4.5) GHz, 16 MB cache) |
| Main memory | 8 GB DDR4 SDRAM, dual channel |
| Storage | 480 GB SSD 2.5 SATA |
| Supply voltage | 100/240 V AC industrial power supply unit |
| Front interfaces | 2x USB 3.0 |
| Rear interfaces | COM1, audio |
| Ethernet | 2x Gbit Ethernet |
| Installation | Horizontal and vertical installation; prepared for telescopic rails |
| Protection | IP30 at the front; IP20 at the rear |
| Lifecycle | Announcement of product phase-out |
Key Features
SIMATIC IPC547J, rack PC, 19", 4 U; prepared for horizontal and vertical installation and telescopic rails.
Intel Core i7-10700E, 8C/16T, 2.9 (4.5) GHz, 16 MB cache; 8 GB DDR4 SDRAM in dual channel.
480 GB SSD, 2.5 SATA, with short enclosure and drive support Type C for internal installation.
2x USB 3.0 on the front; COM1 and audio on the rear; mainboard with 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0 and 2x USB 3.1 Gen. 1.
100/240 V AC industrial power supply unit with Europe power supply cable.
Without expansion and without operating system; DP-to-VGA adapter cable for onboard graphics/graphics card included.
Frequently Asked Questions
What exact configuration does 6AG4104-5ED01-1AX4 identify?
It identifies a SIMATIC IPC547J rack PC, 19", 4 U, with Intel Core i7-10700E, 8 GB DDR4 SDRAM, 480 GB 2.5 SATA SSD and a 100/240 V AC industrial power supply unit.
Which interfaces are included in this line item?
It has 2x USB 3.0 on the front, COM1 and audio on the rear, plus 2x Gbit Ethernet, 1x DVI-D, 1x DisplayPort, 4x USB 2.0 and 2x USB 3.1 Gen. 1 on the mainboard.
How is the rack PC mounted?
It supports horizontal and vertical installation and is prepared for telescopic rails. The 19" mounting bracket can be removed externally.
Does the configuration include expansion or an operating system?
It is without expansion and without operating system.
What quantity, destination, schedule and additional BOM lines should be included in an inquiry?
Include the requested quantity, destination, schedule context and any additional BOM lines with the exact line item.
