Product Overview
Applications
The unit supports temperature monitoring, fan monitoring and monitoring function via network as an optional function.
Technical Summary
| Product type | SIMATIC IPC847E |
|---|---|
| Design | Rack PC, 19", 4U |
| Processor | Intel Core i3-8100 (4C/4T, 3.6 GHz, 6 MB Cache, VT-d) |
| Main memory | 4 GB DDR4 SDRAM (1x 4 GB), Single Channel |
| Storage | 2x 480 GB 2.5" SATA SSD in RAID1 |
| Interfaces | 3x Gbit Ethernet (IE/PN), RJ45; 1x DVI-D; 2x DisplayPort; 1x COM1; audio; USB |
| Supply voltage | 100/240 V AC industrial power supply unit |
| Mounting | For horizontal and vertical installation; prepared for telescopic rails |
| Front protection | IP41 |
| Rear protection | IP20 |
| Operating system | Without operating system |
| Lifecycle | Active Product |
Key Features
Intel Core i3-8100 (4C/4T, 3.6 GHz, 6 MB Cache, VT-d); 4 GB DDR4 SDRAM (1x 4 GB), Single Channel.
2x 480 GB 2.5" SATA SSD in RAID1.
3x Gbit Ethernet (IE/PN), RJ45; 1x DVI-D; 2x DisplayPort; 1x COM1; audio; 4x USB 3.1; 2x USB 3.1 (Type C) on the rear side; 2x USB 3.0 on the front; 1x USB 3.1 internal.
Rack PC, 19", 4U; for horizontal and vertical installation; prepared for telescopic rails; 19" mounting bracket can be removed externally.
100/240 V AC industrial power supply unit; temperature and fan monitoring; Watchdog; without extension (HW); without operating system.
Frequently Asked Questions
What exact product is this line item?
It is Siemens 6AG4114-3AT10-0XH2, a SIMATIC IPC847E Rack PC, 19", 4U.
What processor, memory and storage configuration does it have?
It has an Intel Core i3-8100 (4C/4T, 3.6 GHz, 6 MB Cache, VT-d), 4 GB DDR4 SDRAM (1x 4 GB), Single Channel, and 2x 480 GB 2.5" SATA SSD in RAID1.
Which interfaces are included?
It has 3x Gbit Ethernet (IE/PN), RJ45; 1x DVI-D; 2x DisplayPort; 1x COM1; audio; 4x USB 3.1; 2x USB 3.1 (Type C) on the rear side; 2x USB 3.0 on the front; and 1x USB 3.1 internal.
What is excluded from this configuration?
It is without extension (HW) and without operating system.
What project details should accompany a quotation request?
Provide the requested quantity, destination, schedule context and any additional BOM lines.
