Product Overview
Applications
The configuration supports temperature and fan monitoring.
The configuration includes a Watchdog.
Technical Summary
| Product type | IPC847E |
|---|---|
| Design | Rack PC, 19", 4U |
| Processor | Intel Xeon E-2176G (6C/12T, 3.7 (4.7) GHz, 12 MB Cache,Turbo Boost 2.0, VT-x/-d-Technology, iAMT) |
| Main memory | 4 GB DDR4 SDRAM (1x 4 GB), Single Channel |
| Storage | RAID1, 2x 1 TB HDD 3.5" SATA |
| Interfaces | 3x Gbit Ethernet (IE/PN), RJ45; 1x DVI-D; 2x display ports; 1x COM 1; audio; 4x USB 3.1; 2x USB 3.1 (Type C) on the rear side; 2x USB 3.0 on the front; 1x USB 3.1 internal |
| Power supply | 2x 100/240V AC redundant industrial power supply unit |
| Mounting | For horizontal and vertical installation; prepared for telescopic rails; 19" mounting bracket can be removed externally; tower kit (optional) |
| Monitoring | Temperature and fan monitoring; Watchdog |
| Front protection | IP41 |
| Rear protection | IP20 |
| Product lifecycle | Active Product |
Key Features
Intel Xeon E-2176G with 6C/12T, 3.7 (4.7) GHz and 12 MB cache; 4 GB DDR4 SDRAM (1x 4 GB), Single Channel.
RAID1 with 2x 1 TB 3.5" SATA HDD.
3x Gbit Ethernet (IE/PN), RJ45; 1x DVI-D; 2x DisplayPort; 1x COM 1; audio; 4x USB 3.1; 2x USB 3.1 (Type C) on the rear side; 2x USB 3.0 on the front; 1x USB 3.1 internal.
Rack PC, 19", 4HU, with an enclosure with drive support Type A for trays on the front.
2x 100/240V AC redundant industrial power supply unit.
Without extension (HW), without operating system, without expansions and without power supply cable.
Frequently Asked Questions
What is the exact product line item?
It is 6AG4114-3LC30-0XX0, Siemens SIMATIC IPC847E, a 19-inch, 4U Rack PC.
Which processor, memory and storage are included?
The configuration has an Intel Xeon E-2176G, 4 GB DDR4 SDRAM (1x 4 GB), and RAID1 with 2x 1 TB 3.5" SATA HDD.
Which interfaces are included?
It has 3x Gbit Ethernet (IE/PN), RJ45, 1x DVI-D, 2x display ports, 1x COM 1, audio and the stated USB interfaces.
What is excluded from this configuration?
It is without extension (HW), without operating system, without expansions and without power supply cable.
What project details should accompany a quotation request?
Include the requested quantity, destination, schedule context and any additional BOM lines.
